County engineer details road projects and costs; board approves maintenance quotes
Summary
County Engineer Adam Miller reported on bridge and culvert work, gave cost estimates for two paving projects including a $2.6 million estimate for Underwood Avenue (rising to $3.8 million with added safety features), and the board approved Denco maintenance quotes totaling $231,104.46 and other drainage work.
Get email alerts on the Road Projects topic
No spam. Unsubscribe anytime.
County Engineer Adam Miller updated the Floyd County Board of Supervisors on secondary road work and upcoming projects on May 19, outlining timelines and cost estimates for multiple projects and asking the board to approve routine maintenance contracts.
Miller reported that crews completed cleanup and reopened T64 after a bridge-rail accident, finished culvert repairs along 285th Street, and plan to replace the culvert at 140th Street and Timber Avenue with small box culverts. Construction is anticipated to begin June 1 on the bridge on 170th Street south of Rudd, and resurfacing on Packard Avenue (T47) is expected in August. Patch rock work and dust-control spraying are ongoing.
For pavement projects, Miller provided an estimated cost of $2.6 million for a concrete overlay on T66 (210th Street north to 155th Street). He said adding additional safety features would raise that estimate to $3.8 million. Miller also proposed a T64 project (Shadow Avenue east and north to the county line) estimated at $2.1 million, or $3.2 million with enhanced safety features. He noted the availability of safety grants of up to $500,000 per project.
Miller presented Denco quotes for maintenance work: $78,857.16 for PCC crack filling and $152,247.30 for HMA crack filling, for a total of $231,104.46. Supervisors Campbell and Rottinghaus moved to approve the Denco quotes; the motion carried 3-0.
The board also approved bids and payments for drainage-related work: acceptance of Legge Farms and Drainage’s bid to spray Drainage Ditch #3 for $2,243.19, and payment approvals for repair invoices on Drainage District No. 9 Lateral #19 to Downing Excavating ($2,299.52) and Zimmerman Excavating Inc. ($3,996.75).
Why it matters: The announced timelines and approved maintenance contracts outline near-term county infrastructure work that affects local travel, safety, and budgets. The paving estimates indicate substantial capital requests will be needed if safety enhancements are incorporated.
Next steps: The county will proceed with Denco maintenance work, arrange the 170th Street bridge construction beginning June 1, and pursue design/right-of-way work and grant applications for larger paving projects.