Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Permits Septic Construction topic
No spam. Unsubscribe anytime.
Bolton Inland Wetlands Commission unanimously approves three permits for septic work and new home
Summary
At its Feb. 25 meeting the Bolton Inland Wetlands Commission approved three permits — an outbuilding conversion at 139 Vernon Rd, a new septic system at 20 Goodwin Rd, and construction of a single‑family home at 0 Vernon Rd — each conditioned on compliance with State of Connecticut regulations.
Get email alerts on the Permits Septic Construction topic
No spam. Unsubscribe anytime.
The Bolton Inland Wetlands Commission unanimously approved three permit applications at its virtual meeting on Feb. 25, 2025, each conditioned on conformity with State of Connecticut regulations.
Wetlands Agent Alyssa Barroso reported a site visit and said she had no concerns about the proposed conversion of an outbuilding at 139 Vernon Road to a studio with a bathroom. Barroso noted there is a buffer between the building and the lake and that the applicant submitted silt‑fence plan details. Daniel Dziadul told the Commission the Health Department is awaiting the Commission’s approval. Vice Chair James Loersch moved to issue the permit for #IW‑25‑1; the motion, seconded by Diane DeNunzio, passed 4‑0‑0.
On a second application, Barroso said a proposed septic system at 20 Goodwin Road lies about 40 feet from an intermittent stream and she had no concerns with that separation. Applicant Chris Sutyla (County Line Septic) said excavated material will be hauled off site, leaving only a small pile of topsoil. Loersch moved to issue the permit for #IW‑25‑2 with the same state‑regulation condition; the motion passed 4‑0‑0.
For a third application, Barroso said she worked with applicant James Read on a "robust riparian buffer" for a single‑family home proposed at 0 Vernon Road and provided a plant‑list guide to support plantings in some buffer areas. Read told the Commission he has received Health Department approval. Diane DeNunzio moved to issue the permit for #IW‑25‑3; the vote was 4‑0‑0.
Votes at a glance
• #IW‑25‑1 — 139 Vernon Rd (Brian Patsun, Septicology): Motion to issue permit moved by James Loersch, seconded by Diane DeNunzio. Outcome: approved, 4‑0‑0. Condition: work must conform to State of Connecticut regulations.
• #IW‑25‑2 — 20 Goodwin Rd (Chris Sutyla, County Line Septic): Motion moved by James Loersch, seconded by David Lynn. Outcome: approved, 4‑0‑0. Condition: work must conform to State of Connecticut regulations. Excavated material to be hauled off site; small pile of topsoil to remain.
• #IW‑25‑3 — 0 Vernon Rd (James Read): Motion moved by Diane DeNunzio, seconded by James Loersch. Outcome: approved, 4‑0‑0. Condition: work must conform to State of Connecticut regulations. Riparian buffer plantings and a plant list were provided to guide restoration.
The Commission recorded no public comment during the meeting. The approvals were procedural motions with the agent’s site reviews and conditions focused on state regulatory compliance. The Commission adjourned at 8:31 p.m.
