Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Septic Upgrade topic
No spam. Unsubscribe anytime.
Board approves Geomat leaching system for 296 North Main Street
Summary
Morse Engineering’s project engineer described replacing a failing conventional septic at 296 North Main with a Geomat 3900 system; the Cohasset Board approved the plan unanimously and required no local variances.
Get email alerts on the Septic Upgrade topic
No spam. Unsubscribe anytime.
The Cohasset Board of Public Health unanimously approved a septic upgrade plan for 296 North Main Street on Sept. 16, 2025, permitting the replacement of a failing conventional leaching system with a Geomat 3900 alternative system.
Paul Gunn, project engineer at Morse Engineering, told the board the existing conventional crushed‑stone leaching field was effectively failing due to elevated groundwater. Morse proposed abandoning the existing tank and leach field and installing a new 1,500‑gallon septic tank, a five‑outlet distribution box and a Geomat 3900 leach field. Gunn said the proposal does not increase design flow, proposes to maintain the required 10‑foot setback to the water surface, and does not request local upgrades or variances.
Board members asked no substantive technical questions. A motion to approve the Geomat leaching system plan as presented by Morse Engineering passed by roll call vote. The roll‑call as recorded: Mary Goodman — yes; Marcia Lewis — yes; and a board member recorded as Paul (last name variably transcribed in the minutes) — yes.
The plan approval advances the project to the permitting and installation stage; Morse Engineering will proceed with final plan details and scheduling for construction and inspections.

