Architect briefs staff on church addition and parking plan; geotech and submittal timing flagged

Harrisville Planning Commission · May 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

An architect representing a church described a 3,000‑square‑foot addition, a pavilion and extra parking; staff requested civil, geotechnical and storm‑water details, noted high groundwater on site and said final drawings must be submitted 15 days before the planning‑commission meeting.

Brady G., an architect with Bradley Architect and Associates, presented a site‑plan amendment for an existing church (built in 2012) that would add approximately 3,000 square feet of building area, a pavilion to the north, and additional parking on the east side to reduce curbside parking during larger meetings.

Brady said the site is in the R120 zone and asked whether the expansion requires a new conditional‑use approval; staff advised that a new conditional use is likely and that building permits will also be required. A geotechnical report noted a high water table; staff said removal of the existing pond area will likely require an underground detention system and requested storm‑water calculations and civil drawings. Staff also discussed landscaping expectations (water‑conserving approaches preferred), lighting impacts near neighbors, sprinkler and fire‑alarm checks, and separate sewer‑district coordination for added fixture units.

Timing: staff told the applicant that final drawings must be submitted at least 15 days before the June 10 planning‑commission meeting (otherwise the package will move to the July 8 meeting). The applicant said engineering design has not yet started and will coordinate subsequent submittals and reviews.