Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Subdivision Eb2025 1201 topic
No spam. Unsubscribe anytime.
Planning Board approves preliminary two-lot subdivision for Rushfield Road with conditions
Summary
The board approved preliminary plat EB 2025-1201 for Pat Murphy on Rushfield Road conditioned on an Agricultural Data Statement, updated survey maps and required surveyor signatures; the applicant must file a final plat with the county after conditions are met.
Get email alerts on the Subdivision Eb2025 1201 topic
No spam. Unsubscribe anytime.
The Farmington Planning Board voted to approve the preliminary two-lot subdivision plat for EB 2025-1201, an application by Pat Murphy for property on Rushfield Road, with standard conditions. The board and staff discussed that the application had been deemed complete and that a final site-plan review would be required before any building permits are issued.
The board required the applicant to submit a completed Agricultural Data Statement before final plat approval and asked that the surveyor update the map (dates, signature lines and a local/regional sketch) to reflect conditions in the resolution. Chair noted staff will supply the ag-data form and can assist with completion if needed. "Start with the ag data statement, you gotta have that," Chair said while explaining that the statement must be marked on the drawing.
The board moved to waive reading and approve the preliminary two-lot subdivision plat with conditions. The motion was moved by Regina and seconded by Adrian; the clerk was asked to take a roll-call vote. The transcript records the board approved the preliminary plat, but does not include a detailed roll-call tally. Staff instructed the applicant to work with town staff and the surveyor to finalize the map and submit the final plat for signature and county filing.

