Officials present three school-reconfiguration options with costs from about $49M to $61M; doing nothing estimated at $105M over 20 years

Thomaston Board of Finance · December 9, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Consultants and town staff presented three options for local schools (repair/replace scenarios for Black Rock and new pre-K/purpose-built facilities). Cost scenarios ranged from approximately $49 million to $61 million for options; presenters said doing nothing (making required repairs over 20 years) has an "avoidance" cost estimated at about $105 million. Staff recommended further pricing and a joint board review before narrowing choices.

Town staff and the consultant team reported on a schools feasibility study and a community meeting that presented three primary reconfiguration options. The presenters emphasized that the options were evaluated not just for capacity but for educational quality (right room types, infrastructure and programmatic needs).

The first option described Pre-K–3 at Black Rock School and grades 4–12 at the high school. Presenters showed two cost scenarios for that option: a repair scenario presented at approximately $61 million and a replacement scenario at about $49 million; the difference was explained as a function of expected state reimbursement. The presenters said that the study estimates an "avoidance" cost (the cost of making required repairs across three schools over 20 years) of roughly $105 million.

Alternative configurations included K–6 at Black Rock with a purpose-built pre-K facility and 7–12 at the high school (estimated about $50–51 million), and a configuration with a new pre-K/K building plus the remaining grades at the high school (estimated about $55 million). Presenters discussed trade-offs including lost gym or specialty spaces if the middle school is taken offline and the need to configure the high school to keep different age groups appropriately separated.

Rich and other presenters said the DRA/DRRA final report is nearly complete and recommended reconvening a joint meeting of the Board of Finance and Board of Education to narrow options, cost out two finalists and form committees to make recommendations. They noted that regionalization conversations (preliminary talks with Plymouth and Watertown) continue but that any regionalization process would likely be multi-year (7—20 years). Staff also said they will produce bonding and debt-service scenarios to translate project costs into estimated tax impacts for voters.

Next steps: staff will price narrowed options, run debt-service scenarios and present tax-impact information to help residents and the boards decide whether to place a bond on a future ballot.