Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Memorial Park Project topic

No spam. Unsubscribe anytime.

Board trims Memorial Park playground, prioritizes non-metal benches and removable shade

Park and Recreation Advisory Board, Lower Makefield Township · April 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Engineers presented revised Memorial Park plans that reduce the playground footprint to cut costs; the advisory board voted to reduce surfacing and reallocate funds to non-metal benches and to pursue a removable shade structure and mark space for a future second shade.

The Lower Makefield Park & Recreation Advisory Board reviewed a revised Memorial Park plan in April 2026 and approved a set of changes aimed at controlling a roughly $10,000 budget overrun while adding user-focused features.

Carol Engineering representative Will said the current option places the playground footprint at about 5,800 square feet (reduced from an earlier roughly 7,800–8,000 square-foot concept) and that surfacing is the single largest cost item. Will told the board the current option was about $10,000 over budget but that the project includes a 3% contingency buffer (about $27,000).

Board members identified two priorities: non-metal benches with backs under shade and at least one shade structure to increase sun protection. Will reported a vendor estimate for a 14-by-14 fabric shade structure plus installation in the mid-to-high $15,000 range (vendor line-item shown separately on the estimate); he also said many shade-grant programs (such as the American Academy of Dermatology grant discussed earlier) would not fund shade until a one-year sun-safety program was in place.

To meet the board’s direction, staff proposed modest cost reductions (reduce surfacing area by roughly 300–500 sq ft, substitute a smaller spinner or drop one equipment item) as options to net the needed savings. The advisory board voted to reduce the surfacing area to free funds for non-metal benches with backs, directed staff to investigate a removable shade canopy option, and asked the consultant to show a reserved location for a second future shade structure in design drawings.

Why it matters: Memorial Park serves a broad cross-section of township residents; the changes aim to balance play variety, ADA-compliant access, longer-lasting amenities and shade while keeping the project within budget.

What happens next: Consultant Will will refine plans and pricing (bench materials, removable-canopy options and surfacing alternatives) and return to the board; staff will include the recommended changes when forwarding the project for supervisor approval.