Vienna board sets hearing for proposed 160-foot Verizon cell tower, requests decommissioning study and SHPO letter

Town of Vienna Planning Board · January 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Board set a Feb. 20 hearing on a proposed 160-foot Verizon cell tower at 2083 NYS Rte. 49 and requested additional materials including a SHPO letter, decommissioning-bond study (applicant indicated ~$80,000), drainage details, lease excerpts and fall-zone documentation.

James LaValle presented plans for a 160-foot Verizon Wireless North Bay tower at 2083 NYS Route 49 during the Jan. 16 Planning Board meeting. The board voted to set a public hearing for Feb. 20, 2025 at 7:15 p.m.

Board members pressed the applicant for technical and documentary details: a SHPO (State Historic Preservation Office) letter for the site, a decommissioning-bond study (the applicant referenced an $80,000 bond comparable to a nearby Maple Flats tower), an updated fall-zone letter (the original application referenced a 160-foot fall zone; the applicant said an updated letter shows an 81-foot fall zone), drainage and grating details, and a copy of the lease portion redacted in the applicant's handout that relates to access and underground power-line maintenance through town property.

The board also asked for specifics about utility meters, topsoil and seeding areas outside the fenced compound, potential screening (visibility slats or plantings) and bulb specifications if a light is installed at the top because a private airstrip is nearby. The Planning Board agreed by consensus to accept the ZBA's SEQR materials for this site; Secretary Kathy Pavelock will obtain SEQR documents from the ZBA file for inclusion in the planning board record.

Next steps: the public hearing on Feb. 20 will allow neighbors and other stakeholders to comment. The board indicated it will review the requested materials before taking a final vote.