Rothschild board approves 2025 MS4 stormwater report required by WDNR

Village of Rothschild Village Board · April 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Village Board approved the 2025 Municipal Separate Storm Sewer System (MS4) annual report, with staff citing membership in the North Central Wisconsin Stormwater Coalition and ongoing inspections, construction erosion controls and Salt Wise-certified DPW practices to meet NR 216 (WPDES) requirements.

The Village of Rothschild Board voted April 13 to approve its 2025 MS4 (Municipal Separate Storm Sewer System) Annual Stormwater Report, the document required to comply with Wisconsin Department of Natural Resources (WDNR) MS4 General Permit NR 216 (WPDES).

Administrator of Public Works Timothy Vergara explained the MS4 program and why communities in the metro area are included under the WPDES permitting framework. He described how the North Central Wisconsin Stormwater Coalition (NCWSC) coordinates regional public education and outreach, policy recommendations and shared resources that help municipalities meet NR 216 requirements.

Vergara listed the seven minimum MS4 permit components the village must address: public education and outreach; public involvement and participation; illicit discharge detection and elimination; construction site pollutant control; post-construction stormwater management; pollution prevention for municipal operations; and annual MS4 eReporting. He said outfalls and stormwater basins are inspected annually and that privately owned basins are often bound by maintenance agreements requiring ongoing inspection and upkeep.

Vergara also pointed to operational measures: construction sites must maintain erosion controls that are monitored by the zoning coordinator and DPW, and the village is active in using brine versus rock salt in snow and ice operations; DPW crew members are Salt Wise certified and equipment is calibrated annually. He recommended approval of the report; the board moved to approve (motion Jablonski/Stroik) and carried 7-0.

The approval records the village's participation in NCWSC and ongoing operational practices to satisfy NR 216 permit requirements. The minutes do not list specific enforcement actions or permit deadlines beyond the general annual reporting obligation.