Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use Redevelopment topic

No spam. Unsubscribe anytime.

Planning board moves to create Sadder/Saddler Road commercial overlay to spur redevelopment

Planning Advisory Board · April 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At a Fernandina Beach Planning Advisory Board workshop, members agreed to direct staff to draft a Sadder/Saddler Road commercial overlay using comp‑plan policies to encourage mixed‑use redevelopment of underused shopping centers; a three‑person subcommittee will meet May 7 to prepare maps and draft language.

The Planning Advisory Board of Fernandina Beach on Wednesday agreed to pursue a commercial-overlay district for the Saddler Road corridor to encourage redevelopment of long‑vacant shopping centers and create more walkable, mixed‑use corridors.

Mia Sather, a planner in the city’s planning office, welcomed the direction, saying, “I like where this conversation is going, talking about moving the storefronts to the front and maybe having some residential on top,” and argued that adding residents near storefronts could help sustain local businesses.

Board members framed the overlay as an implementation of existing comprehensive‑plan policies. One committee member pointed to policy language in the comprehensive plan (policy 10404 and related objectives) that already identifies destination activity centers and authorizes overlay districts to encourage redevelopment.

Discussion focused on the tools the overlay could use: density bonuses, combined‑lot options, expedited review, revised use tables to allow contemporary uses (for example, a coffee roaster paired with a small shop), relocation of parking to the rear, and shared parking and pedestrian‑oriented design. "We incentivize them by saying, please build something nicer ... allow them to combine lots," a committee member said, arguing that flexibility could make large shopping‑center projects financially viable.

Board members also debated environmental and engineering limits. One member warned that raising allowable impervious surface without controls could increase runoff and flood risk: “Impervious surface has to do with runoff, water quality, groundwater recharge and flood protection,” the member said. The group compared county and city practices during that exchange (county impervious allowance was cited in discussion as roughly 67% versus the city’s current 60%).

Members proposed using Saddler Road as a pilot overlay — covering existing commercially zoned parcels along Saddler between 14th Street and the beach — and to follow ownership boundaries so the overlay does not split parcels. The board emphasized that an overlay would not, by itself, change a parcel’s underlying zoning or force property owners to redevelop; it would offer an optional, incentive‑based pathway if owners choose to use it.

The board set practical next steps: staff will prepare map drafts and a short outline of overlay elements drawn from the comp plan; a three‑person subcommittee will meet Wednesday, May 7 at 1:00 p.m. to refine materials; and the board chair or staff will brief city commissioners individually for early feedback before more detailed density or impervious‑area standards are proposed. "Put your suggestion on what we're thinking," one member urged during the planning of outreach.

The workshop closed with members agreeing to treat Saddler Road as a test case: if the overlay demonstrates success, the approach could be adapted for other corridors such as 14th Street and the 8th Street commercial district. The board adjourned after scheduling the subcommittee and confirming their next regular meeting would include the overlay as a priority item.