Salisbury Pathways Committee authorizes up to $2,500 for DOT mapping with Allied Engineering

Salisbury Pathways Committee (with related Conservation Commission minutes) · June 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Pathways Committee won Selectmen approval to spend $2,500 toward an Allied Engineering mapping and survey to support a feasibility study for a sidewalk from Meadow Street to the new firehouse; the committee approved a resolution authorizing Pat Hackett to negotiate scope with AEA.

The Salisbury Pathways Committee said the town would provide $2,500 to start a feasibility study for a proposed sidewalk between Meadow Street and the new firehouse, authorizing Allied Engineering Associates (AEA) to perform DOT mapping, a field survey and base map preparation.

At the committee's March 16 meeting, members reported the Selectmen had approved the committee's request for $2,500 toward the study. Pat Hackett presented AEA's Estimate of Professional Services, which lists a total engineering fee of $12,000 and a $6,500 design-development phase that includes DOT mapping, topographic and utilities survey, and base-map preparation.

The committee resolved to approve up to a maximum of $2,500 to pay AEA for Section 1 services (DOT mapping/property-line research, field survey, base-map preparation). The resolution authorizes Pat Hackett to negotiate the scope and payment with AEA and to order the work only if he can keep it at or below the $2,500 limit.

Committee members emphasized fiscal prudence during discussion about ensuring the committee would not overpay AEA while getting the feasibility work started. Minutes record the action as approved unanimously.

Next steps recorded in the minutes included delivering an executed agreement and a $1,000 retainer so AEA could begin the survey work and produce a base map to guide design decisions.