Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan topic

No spam. Unsubscribe anytime.

Committee to confirm Conservation Commission and stormwater sign-off for proposed second exit

PBC (Project Building Committee) · June 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Members debated whether a proposed second curb cut for lot H requires Conservation Commission or ZBA review, discussed stormwater and culvert options to address an existing swale, and agreed to confirm requirements with Bill Renault and submit an amended site plan if needed.

The committee discussed a potential second exit (curb cut) for lot H and whether the change would trigger outside approvals.

Designers said that because the work does not fall within a buffer zone, "it would just be for stormwater," which Bill Renault could sign off on if the stormwater requirements are met. The chair asked staff to circle back with Renault to determine how much of a sticking point the second exit would be and whether ConCom, ZBA or other reviewers are required.

Members also raised operational and safety questions tied to elevation changes and the existing swale that drains toward wetlands at the end of the baseball field. The design team proposed using a culvert to maintain flow and avoid "damming up that area." Committee members suggested making any secondary gate operable only with police presence and discussed sight-line and speed concerns for drivers on Palm Street.

What happens next: staff will contact Bill Renault and report back on whether a full ConCom filing is required; if so, the team will amend the site plan and prepare materials for ConCom review.