Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater Management topic

No spam. Unsubscribe anytime.

Village engineer posts MS4 draft for public comment; final submission to DEC set for April 1

Larchmont Board of Trustees · March 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Gino, the village engineer, told the board the annual MS4 draft for the village storm sewer system is posted on the village website for public comment and will be finalized and submitted to the DEC on April 1, with backup materials posted online.

Gino, identified by the chair as the village engineer, told the Board of Trustees that the village’s annual MS4 draft has been posted to the village website for public review. “It will be finalized and submitted to the D.E.C. on April 1, along with and posted with it, any backup information,” he said.

Gino explained an MS4 is an annual report to the DEC that governs the village’s storm sewer program; he differentiated the storm sewer from the sanitary system and said the posted materials include supporting documents. Trustees acknowledged the announcement and had no immediate questions recorded during the work session.

The posting starts the public comment window ahead of the April 1 submission deadline; residents seeking to comment or review the MS4 draft should consult the village website for the posted materials.