Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Commissioners refer proposed county gateway signage to tourism council after cost, design and funding debate

Walton County Board of County Commissioners · June 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a lengthy discussion about proposed $86,000 monument signs at multiple county entrances, the board directed staff to present designs and funding options to the Tourist Development Council for review and return with recommendations.

County staff presented conceptual gateway sign designs and initial quotes (~$86,500 per sign for a full-size monument on flat ground) and noted there are roughly 11 official entry points on state and U.S. highways. Commissioners and members of the public raised questions about cost, aesthetics, whether Tourist Development Council (TDC/TDT) funds or general-fund monies should be used, and the need for Design Review Board (DRB) oversight. Several residents urged a unified brand and DRB review; others opposed high expenditures while parks and recreation and public safety needs remain.

After extended public comment the board directed staff to present the concept and materials to the TDC for review and to return with a recommendation on gateway signs (which TDC can vet under its traditional funding rules). Commissioners emphasized any signs on Highway 98 will require DRB review if funded with TDT/TDC dollars; staff will report back with phased options, scaled‑down sign alternatives and funding sources.

No purchase was authorized; direction was to seek TDC review, design‑review input and tighter cost estimates.