Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities Odour Control topic

No spam. Unsubscribe anytime.

Rowlett council unanimously approves $140,000 odor-control system for lift station

Rowlett City Council · June 2, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Rowlett City Council adopted a resolution June 2 to buy and install a biological and vapor‑phase odor control unit (AOP) for the Rowlett lift station from Inpipe Technology Company, Inc., a sole‑source vendor, at a cost not to exceed $140,000; the vote was 7–0.

The Rowlett City Council voted unanimously on June 2 to authorize purchase and installation of an advanced oxidation process (AOP) biological and vapor‑phase odor control system for the Rowlett lift station.

Staff presented the item and explained the city has been addressing odor complaints for more than a decade through chemical treatment and monitoring. The proposed system captures and oxidizes odor compounds within the lift‑station headspace before they are released into the atmosphere; staff said the city has tested similar systems in other area jurisdictions.

Manal (staff) told council the city has an available budget of a little over $317,000 and the proposed amount for this program is $140,000. Gary, interim director of public works, said the city visited sites using the product and that case studies indicate the system has been successful.

Council member Holston moved to adopt the resolution authorizing purchase and installation of the biological and vapor‑phase odor control program from Inpipe Technology Company, Inc., as a sole‑source vendor, for a total price not to exceed $140,000; the motion was seconded by John Bowers and carried unanimously, 7–0. The resolution authorizes the city manager or designee to execute necessary documents to effectuate the purchase.

What happens next: Staff will proceed with procurement and installation as authorized by the resolution.