Rye Conservation Commission raises no objection to 16 Wentworth Road shoreline stabilization proposal
Summary
The commission reviewed a shoreline stabilization plan for 16 Wentworth Road, including repair of a retaining wall, a slurry wall and a pier ramp; members voiced no substantive objections and asked the applicant to lower the grade to protect an on‑site tree.
Get email alerts on the Shoreline Stabilization topic
No spam. Unsubscribe anytime.
The Rye Conservation Commission on April 9 reviewed a shoreline stabilization proposal for 16 Wentworth Road (Tax Map 26, Lot 18) submitted by 'Sixteen Wentworth Road 2024 Trust' with TF Moran. The plan includes shoreline stabilization, repair of an existing retaining wall, installation of a slurry wall, backyard regrading, rip‑rap repair and an added pier access ramp.
Commissioners asked questions about the proposal but raised no substantive objections; Hugh Lee moved that the Commission has no opposition to the proposal as presented and asked the applicant to lower the grade near a tree to reduce impacts. Shawn Joyce seconded the motion, which the minutes record as approved unanimously.
The applicants previously hosted a site walk with RCC members. Any required variances were listed in the materials provided to the commission; the minutes note the applicable buffer variance cited as "190‑3.1.H(2)(a)(f): 100' tidal buffer." The commission asked the applicant to incorporate the tree‑protection suggestion when finalizing site plans.