Council approves speed table near Egbert Field with added drainage funding after safety debate

Rio Vista City Council · January 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After debate between staff about drainage/ADA constraints and parents urging proximity to a ballpark crosswalk, the council approved moving a speed table near Egbert Field closer to the crosswalk and added an amendment to allocate roughly $10,000 for drainage/ADA work.

The Rio Vista City Council voted to approve an alternate location for a speed table on Saint Francis Way near Egbert Field and to allocate additional funds to address drainage and ADA compliance after an extended discussion and public comment.

Staff engineering analysis identified constraints at the originally proposed crosswalk location — manholes, ADA ramp conflicts and storm‑drain issues — and recommended moving the speed table roughly 100–175 feet north to avoid costly site improvements. The city engineer told the council that placing the table directly on the crosswalk would require demolishing and rebuilding an ADA ramp and installing drainage piping.

Several councilmembers, parents and frequent ballpark attendees pushed back. One parent said placing the table 175 feet from the crosswalk “puts it down at the yard for the city” and warned: “I promise you, as soon as those front tires come off… they’re gonna gas it.” Council member Stanish argued the public‑safety imperative should favor the crosswalk location even if additional spending is needed: “If a child gets killed in that area, that child can't get fixed.”

After discussion about alternative locations (a dotted‑line option about 100 feet from the crosswalk was repeatedly cited) and estimated costs — staff noted the installation alone could be about $40,000 — the council approved a motion to place the table as close to the crosswalk as feasible and to add approximately $10,000 to address drainage/ADA needs. The motion passed on roll call with the council voting in the affirmative.

What’s next: Staff will return with final design details and a short budget adjustment to fund the drainage/ADA work. Council members indicated they will pursue complementary measures (signage, flashing lights, ‘rumble strip’ dots and striping) to maximize pedestrian visibility.

Representative quotes from the meeting: “We do need some shade… the city would want to have some beautification” (public commenter on a separate item). On the speed table debate a parent said: “I promise you… there’s gonna be a launch off of the speed ramp, guaranteed, within the 1st 6 months.” Council member Stanish said: “If a child gets killed in that area, that child can't get fixed.”