Summary

The Quincy Planning Board approved a Certificate of Consistency for a 315‑unit, 55+ condominium development at 1600 Crown Colony Drive, subject to conditions including pedestrian improvements, stormwater controls, and a $50,000 contribution for traffic safety measures.

The Quincy City Planning Board voted to approve a Certificate of Consistency for a 315‑unit, 55+ residential development at 1600 Crown Colony Drive on June 10, 2026, subject to a set of special and general conditions set by city staff.

Attorney David Mahoney, representing Atlantic 1600 Crown Colony Realty LLC, told the board the proposal would replace an existing office campus with five six‑story buildings, a 2,500‑square‑foot clubhouse, pocket parks and 559 proposed parking spaces on a 15‑acre parcel. Civil engineer Nick Doohurst said the design reuses an existing detention basin and includes proprietary stormwater quality units to meet the city’s total suspended solids and phosphorus requirements. Jeffrey Durk, the project’s traffic consultant, presented a transportation analysis that estimated weekday peak hours of roughly 60–79 vehicle trips and recommended a rectangular rapid flashing beacon at the northerly driveway and off‑site signal timing improvements.

The Planning Department, through Mr. Stevens, recommended approval under Quincy zoning (Title 17, section 8.5) with conditions requiring, among other items: submission of an inclusionary zoning (ICO) application to the Affordable Housing Trust Fund Committee; city stormwater and drain permits and an EPA construction general permit prior to issuance of building permits; a construction management plan and sidewalks reconstructed to ADA/AAB standards; pedestrian refuge and a three‑way rectangular rapid flashing beacon at the southern crossing; a recorded stormwater operation and maintenance plan; noise, rodent and dust control plans; a pre‑demolition asbestos survey; and a $50,000 contribution to the Department of Traffic, Parking, Alarm and Lighting to fund planning and short‑term traffic safety measures in Crown Colony Drive.

Mahoney and the project architect, Dan Skolski of DMS Design, described the units as for‑sale condos with a mix of one‑ and two‑bedroom homes, each with exterior balconies. The project team said the buildings will be all‑electric and that they had incorporated fire‑department access changes requested during peer review. Several members of the public and local trade unions spoke in support, urging the use of local labor and noting the developer’s past projects in Quincy.

A board member moved to approve the certificate of consistency based on the department’s recommended special conditions; the motion was seconded and the chair called the vote, announcing approval. The decision includes the conditions read into the record by the department staff and the requirement that the applicant comply with all state and city permits listed before construction begins.

City staff said the project will be subject to ongoing review through the building permit and inspection process and that the Affordable Housing Trust Fund Committee must act on the ICO application before issuance of an occupancy permit.