Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Retroactive Work topic

No spam. Unsubscribe anytime.

Commission grants retroactive approvals at 9 Ashlin Street with conditions on chimneys, windows and masonry

Worcester Historic Commission · June 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission granted a certificate of appropriateness and a demolition-delay waiver for partially retroactive exterior work at 9 Ashlin Street, requiring two rebuilt chimneys with color-matched mortar, retention of specified porch arched windows, a fiberglass front-door replica, brick repointing and non-sandblasting stripping of paint.

The Worcester Historic Commission approved a certificate of appropriateness and a demolition-delay waiver for partially retroactive work at 9 Ashlin Street, subject to conditions including color-matched mortar for rebuilt chimneys, retention of arched porch windows, a fiberglass replica front door confirmed by staff, brick repointing and stripping paint by non-sand methods.

Adam Gaval, the general contractor and property manager for Monroe Management LLC, explained the project is a conversion to 16 one-bedroom units and described exterior repairs and replacements. Commissioners addressed concerns about chimneys that had been removed without prior approval, debated the use of brick veneer versus full masonry, and emphasized that the commission does not want a pattern of inappropriate veneers in the district. The commission ultimately approved the applicant’s revised package — two chimneys to be reconstructed with the proposed square-edge brick veneer and color-matched mortar, retention of the porch arched windows, window replacements elsewhere as proposed, a fiberglass one-to-one replica front door as confirmed by staff, masonry repair and repointing, and stripping paint (explicitly prohibiting sandblasting).

Because only five commissioners were eligible to vote at that point in the meeting, the certificate and the demolition-delay waiver were approved by the participating members on roll calls with the recorded yes votes.