Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Art topic

No spam. Unsubscribe anytime.

York College mural approved for rear cinder-block wall at 36 West Philadelphia Street

York City Historical Architectural Review Board · June 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

York College presenters showed a 30-by-16-foot adhered mural depicting York City landmarks; the Historical Architectural Review Board approved the installation with the consultant's recommended conditions for attachment to a modern rear-facing cinder-block wall.

Representatives from York College presented a student-designed mural proposal for 36 West Philadelphia Street and received board approval on June 11, subject to the consultant’s recommendations for proper installation on a modern rear-facing cinder-block wall.

Rebecca, who identified herself as working for York College, introduced the project and said the mural would be adhered to a rear cinder-block wall. Gabriel Sanchez Karpio described the design as composed to show local landmarks, saying the design aims “to like show important buildings around York City” and to showcase community and the city.

The presenters explained installation methods, including surface preparation such as power washing and the use of a high-resin acrylic medium and adhesive systems the team characterized as permanent and sustainable. Board members asked about wall preparation and materials; presenters said they would use an acrylic medium and might powerwash the wall but would not undertake invasive demolition.

A committee member moved to approve the application as submitted with the stipulation that the consultant confirm appropriate adhesion to the modern rear-facing cinder-block surface and installation methods; the motion carried unanimously. Staff and the consultant will confirm installation details and ensure required specifications are provided prior to final sign-off.