Commissioners discussed program successes and new offerings (homeschool art show, pen‑pal program, soccer clinic), evaluated equipment purchases (soccer nets, backstops) and heard that playground woodchips will be delivered May 1 while the town engineer will meet May 6 to discuss a stormwater/beach sand permit.
Get email alerts on the Parks And Recreation topic
No spam. Unsubscribe anytime.
At the April 15 meeting the Sandown Recreation Commission reviewed recent program successes and several facilities and equipment needs.
The director praised the homeschool art show, saying about 45 children submitted work and roughly 128 visitors toured exhibits during the event; organizers plan to make the show annual and to adopt online voting to speed future tallies.
The commission approved a pen‑pal program proposal to pair up to 12 seniors at the Big Gary with children in town, with a planned six‑month exchange and a kickoff meet-and-greet; the director requested about $60 for two small mailboxes to support the program.
Commissioners considered senior trip options (a June 10 tea house and visit to a butterfly conservatory at $38 per person) and discussed accessibility concerns. The Hampton Chamber of Commerce offered discounted seafood festival tickets to groups that can supply a bus; commissioners weighed the discount versus bus costs and rider commitments.
For youth sports, a volunteer instructor has agreed to run a soccer clinic and a toddler soccer program; the instructor is volunteering and fingerprinting was in process. Fees were set at $15 for the clinic (ages 7–10) and $5 for intro to soccer (ages 3–6). Commissioners also discussed appropriate net sizes for different age groups and the need to weight nets with sandbags after a prior incident in which a net fell.
On field infrastructure, the director has been sourcing permanent backstops and reached out to vendors and regional rec directors; local fence contractors were recommended for simpler t‑ball backstops. The director reported the town engineer will attend the May 6 meeting to discuss a stormwater treatment plan and that a permit will be required for beach sand replenishment (the transcript referenced a permit fee figure of about $600 but the exact scope and cost were described as "not specified").
Playground woodchips are scheduled for delivery May 1 and volunteers and the alliance will be coordinated to spread them; staff will confirm volunteer timing around other community events.
No formal votes were taken on purchases or contracts at the meeting; commissioners directed staff to continue vendor outreach, confirm pricing and bring proposals back for formal action as needed.