Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Shoreland Photography topic

No spam. Unsubscribe anytime.

Committee proposes mandatory pre- and post-construction shorefront photos with embedded timestamps

Denmark Ordinance Review Committee · June 3, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee added a shoreland provision requiring photographic documentation of pre- and post-construction shorefront conditions, with digital timestamps embedded by the capture device and submission to the CEO.

Meredith presented a new shoreland documentation requirement that would require applicants for building or use permits in the shoreland district to submit photographic records of all areas proposed to be disturbed, including vegetation along the entire shorefront, both before work begins and within 20 days after construction is complete.

She told the committee that "photographs shall include an embedded digital timestamp showing the date and time the photograph was taken. The time stamp must be automatically generated by the device used to capture the image and may not be manually added or altered," noting that most smartphones and digital cameras already provide that capability. All photos are to be submitted to the CEO as part of the permit file.

Committee members asked whether the timestamp requirement would discourage applicants; Meredith and others said the feature is widely available on modern devices and that the rule was intended to reduce disputes about preconstruction site conditions and shorefront vegetation post-construction. The requirement applies specifically to shoreland permits and is phrased to document both preconstruction conditions and post-construction outcomes.

The committee agreed the language as written was clear enough to proceed but said staff should keep the requirement user-friendly and provide guidance for applicants on how to produce acceptable timestamped images.

The draft will be folded into the shoreland section and reviewed again at the next meeting and at the July workshop with the select board.