Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lake Maintenance topic

No spam. Unsubscribe anytime.

Premier Lakes reports algae and lowers compressor noise at River Ridge lakes

River Ridge Community Development District Board of Supervisors · July 23, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Premier Lakes told the River Ridge board that lakes and dry retention areas are generally in good condition though seasonal algae was observed; a cabinet reduced the Masters Lake compressor sound from 64 to 52 decibels and staff will evaluate moving the compressor after concerns about tone were raised.

At the July 23 meeting Premier Lakes representative Bill Kurth reported routine lake maintenance results and noise mitigation steps for the Masters Lake aeration system.

Kurth said the lakes, preserves and dry retention areas "are in good shape" but noted seasonal algae growth. He said a cabinet installed around the compressor reduced the measured sound level at the site from 64 to 52 decibels and that plantings are scheduled for near-term installation.

Operations Manager Shane Willis said his lake audit found that although decibel levels improved, the aerator's "tone" remains an issue. Discussion focused on possibly moving the compressor and questions about easements. Kurth and staff will coordinate to evaluate relocating the compressor and will report findings at the next meeting.

Mr. Schultz summarized issues in Edgewater, including flooding and potential littoral plantings for Lake E4-A; the consensus was to delay planting Lake E4-A until an agreement is reached with the Edgewater Condominium Association and Cambridge Management.