Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lake Levels And Operations topic

No spam. Unsubscribe anytime.

Belgrade dams committee approves minutes, outlines winter drawdown strategy

Belgrade Area Dams Committee · January 12, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Belgrade Area Dams Committee approved December minutes, reviewed current lake levels across four lakes, and directed operators to continue a slow drawdown to maintain upper winter storage at its Jan. 12 meeting.

The Belgrade Area Dams Committee approved its December minutes and reviewed current lake levels at a Jan. 12 meeting at the Belgrade Town Office.

Craig Alexander, chair of the committee, reported Great Pond at 246.35' (about 15.5" below full) with the gate open 15". Committee member Tom Bennett reported Long Pond at 236.11' (about 14" below full) with Gate 1 open 30". Committee member Ted Fontaine reported Salmon Lake at 277.2' (about 9" below full), noting Gate 3 turns and Valve 1 cfs (cubic foot per second). Committee member Dick Greenan reported Messalonskee Lake at 235.10' (about 3.6" below full).

Tom Bennett said his name should replace 'Cam' on the December minutes, then moved to accept the minutes; Blaine Horrocks seconded the motion and the committee voted all in favor. The committee recorded no new maintenance issues at this meeting.

The panel directed dam operators to continue monitoring water levels and to slowly draw down as needed to maintain the upper end of winter storage. The committee did not adopt any new maintenance projects or changes to operating procedures at this session.

The committee scheduled its next meeting for Monday, Feb. 9 at 4:00 p.m. The meeting adjourned at 4:18 p.m.