Select Board approves $13,850 Sebago Technics proposal for sand-and-salt shed site-plan work

Denmark Select Board · March 17, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Denmark Select Board voted to accept Sebago Technics’ March 17, 2026 proposal, authorizing $13,850 for an existing-condition survey, site civil design and permitting work for a proposed sand-and-salt shed and fueling station; funding was identified from FEMA-appropriated funds for the project design phase.

The Denmark Select Board voted to accept a proposal from Sebago Technics to complete site civil survey, design and permitting for a proposed sand-and-salt shed and replacement fueling station.

The proposal, dated March 17, 2026, calls for an existing-condition/field survey, topographic mapping, site-plan design for an approximately 80-by-100 building footprint and associated fueling, driveway and parking work. The board recorded the total design-phase cost at $13,850 and confirmed the funds for the study are available from FEMA-appropriated money previously earmarked for the project’s planning and design.

A motion to accept the proposal was moved and seconded and the board voted in favor. Board members asked project staff to confirm whether soil-condition testing (beyond the civil survey) would be required for future design phases and noted that the site-plan work does not include geotechnical testing, which would be a separate procurement if needed.

Members also discussed a separate construction estimate for a metal building (82-by-102) the town recently received — roughly $227,471 for building and labor — but emphasized the current vote only authorizes the site civil design and permitting work needed to determine feasibility and siting.

Next steps: staff will authorize the Sebago Technics scope, confirm the survey schedule (anticipated to begin quickly) and return later with results from the survey and the site-plan deliverables for permitting and any soil/geotechnical recommendations.