District details athletic-field repairs, playground fixes and pest control
Summary
Facilities staff reported removal of poor infield material, aeration and reseeding of baseball and practice fields, purchase of a replacement tractor, a contracted prairie-dog abatement program, playground wood-chip repairs, and about $15,000 invested toward a fire reinspection and required fixes.
Get email alerts on the Facilities Maintenance topic
No spam. Unsubscribe anytime.
Facilities staff provided a multi-part update on campus improvements, saying work on athletic fields, playgrounds and safety systems is underway.
On the athletic fields, staff reported that a prior water-line repair and a low-quality infill material left coarse gravel in the baseball infield. The district removed the poor material, aerated and top-dressed the infield with a sand-and-seed mix, fertilized infield and outfield and conducted a frost seeding; staff said early signs show grass sprouting in repaired areas and they will document progress with monthly photos.
The district replaced an aging tractor that had difficulty climbing the high-school slope and said the new machine has allowed crews to better manage field work. The record identifies the new machine in the transcript as "K Cabota".
For pest control, the district contracted a firm identified in the record as "Orcin" for prairie-dog abatement. The contractor visited three times in the previous month; the contract was described as a heavy initial treatment followed by monthly visits.
On playgrounds, staff installed wood chips at the older south-side middle-school playground to address muddy conditions that were tracking into the building. The presenter noted the new playground installed last fall uses shredded rubber underlay and the older playground required the chips.
Safety work includes preparation for a fire reinspection scheduled for March 23–24. The presenter said the district spent about $15,000 on corrective work and named an inspector working with the district (Michaela Bamer), who had been reasonable in acknowledging some work will take additional time or cost to complete.
The facilities presenter also discussed a short CTE/kitchen project being scoped with local contractors and participants identified as Sean and Todd Stevens; the presenter said the shell of the planned CTE building does not include a full commercial kitchen but the smaller project could add additional implements where space permits. A district staffer (Mr. Long) noted storage shortages in the affected areas.
Board members asked about slope work and long-term landscaping options; staff said they used an industrial rake on the new tractor to flatten old prairie-dog mounds and will treat slopes for weeds and consider long-term, low-water landscaping options such as native prairie grass maintained with periodic brush-hogging.