Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Rda Bassford topic

No spam. Unsubscribe anytime.

Commission issues determinations for proposed deck at 26 Bassford Lane

Dennis Conservation Commission · May 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Dennis Conservation Commission closed the hearing for a 420-square-foot deck/porch at 26 Bassford Lane and approved both a 'positive 5' determination (subject to town bylaw review) and a 'negative 3' finding that the work lies within the buffer but will not alter the resource area; applicant offered adjacent plantings as mitigation.

Wayne Tavares of Wet Tech Land Design told the Dennis Conservation Commission that the proposed 420-square-foot project at 26 Bassford Lane fills an existing gap between two building sections with an open deck, a covered deck and a covered entry and that the work is sited largely outside the 50-foot buffer to the wetland.

The project proponent offered adjacent plantings of sensitive fern as mitigation after consultation with staff, and the consultant said the project mostly occupies previously disturbed area from the home's original construction. After brief public comment and no objections, commissioners moved first to close the hearing and then to vote on determinations. Commissioner motioning language described issuing a ‘positive 5’ determination as the area and works shown were subject to review and approval by the town bylaws, and the body subsequently voted to issue a ‘negative 3’ determination finding the described work is within the buffer zone but will not alter the resource area.

The commission asked staff to draft the order for the next meeting; there were no conditions raised by members beyond the agreed mitigation planting. The motions carried on voice votes.