Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Excavation Permit topic

No spam. Unsubscribe anytime.

Planning Board renews Eastern Materials excavation permit for three years

Planning Board · March 26, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Board granted Eastern Materials a three-year renewal of its excavation permit after confirming site stabilization, fence repairs and that well water samples were sent to a lab; the board noted the bond was signed by the Board of Selectmen.

The Planning Board voted to renew Eastern Materials’ excavation permit for three years after being told the entryway had been stabilized and the site’s fence repaired.

Board members noted a well has been installed and water samples were taken and sent to a laboratory; the minutes state the test results will be submitted to the town engineer. The Board also recorded that the excavation bond has been signed by the Board of Selectmen.

Barry Hantman moved to grant the renewal; Paul Taglieri seconded. The motion carried, the minutes say. Following the vote, Leo Traverse recused himself because his property was the next agenda item.

The renewal is administrative: the record lists site stabilization, a repaired fence, and pending water-test results as conditions noted by the Board. The minutes do not specify the laboratory results or any additional conditions attached to the permit renewal.