Summary

The Richmond Redevelopment Commission unanimously approved Resolution 4 (2026) to allocate up to $270,600 from allocation area one to fund prioritized structural, bathroom and door repairs at the city‑owned parking garage and bus terminal; staff warned elevator repairs will require temporary service suspension until fixed.

The Richmond Redevelopment Commission voted unanimously June 16 to authorize up to $270,600 for repairs and maintenance at the city‑owned parking garage and adjacent bus terminal.

Matt Keller, director of public operations, told the commission staff identified three high‑priority items from a 2020 facility assessment that remain unfinished and require funding: structural repairs to ceiling and slab joints, upgrades to terminal bathrooms, and door maintenance throughout the facility. Keller said the department requests a not‑to‑exceed total of $270,600 to complete those repairs.

A contractor who inspected the site described the failing expansion‑joint sealant as the main source of water intrusion and ceiling damage; he said the work will require grinding out existing material and installing an industrial‑grade sealant rather than a temporary patch to achieve a durable fix. Keller said the repairs are intended as a longer‑lasting solution rather than another short‑term patch.

Commissioners were told the terminal bathrooms are already closed because of deterioration and vandalism. Keller said Indiana Homeland Security’s recent elevator inspection identified infractions that must be corrected — one fix requires the elevators’ smoke‑alarm systems to be tied into elevator recall, work for which staff received a proposal but currently lack funds. He said Homeland Security will follow a process on June 23 to take the elevators out of service until the necessary repairs are made; stairs will be the only vertical access while repairs are completed.

Commissioners discussed staging the work to limit public impacts and whether some door repairs could be done in‑house to reduce costs. Keller said the figures presented are estimates and that the department will put the work out to bid; he also noted contractors provided rough inflation adjustments in the range of 35–40 percent from the original 2020 estimates.

A motion to approve Resolution 4 carried on a roll call with all members present recorded as voting in favor. The commission directed staff to return contract documents and bid specifications as needed and to provide any necessary adjustments to the project scope and schedule.