Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Utilities Maintenance topic

No spam. Unsubscribe anytime.

Beaver Crossing board approves trial of Superzyme for lift station grease control; maintenance also discusses generator

Beaver Crossing Village Board of Trustees · January 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a trial of Superzyme enzyme/degreaser for the village lift station at a quoted cost of $298.75 for two months, and Maintenance Supervisor Steve Brackhan raised the idea of installing a generator at the north well for reliability concerns.

Beaver Crossing maintenance staff and contractors described options to reduce grease in the village lift station and to improve reliability at the north well. Rick Micek presented information about Superzyme, an enzyme and degreaser designed to keep grease down in lift-station systems, and quoted a two-month supply cost of $298.75.

Following a motion by Jere Leif and a second from Chairman Jerry Zieg, the board approved a trial of Superzyme by roll call vote (5-0). Maintenance Supervisor Steve Brackhan also recommended the board consider installing a generator at the north well to ensure continuous operation during outages; the board did not take an immediate motion on the generator but recorded the suggestion for future consideration.

The trial authorization directs maintenance to evaluate Superzyme's effectiveness and report back. No long-term procurement or contract was finalized at the Jan. 8 meeting.