Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wastewater topic

No spam. Unsubscribe anytime.

Emergency pump purchase approved after village lift‑station failure

Village Board of Owego · June 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After both pumps at a village lift station failed following an influx of non‑flushable material, the board authorized an emergency purchase of a replacement pump and directed funds be drawn from the sewer capital improvement reserve.

The Village of Owego authorized an emergency purchase of a replacement pump for a municipal lift station after both original pumps failed during a recent service event.

Public works staff reported that excessive non‑flushable material entered the station and caused one pump bearing to fail and another pump coil to burn out, leaving both pumps inoperable. Contractors provided immediate assistance to keep sewer service moving while staff pursued a durable replacement.

Because of supply constraints the board approved purchasing a specific replacement model from the vendor identified in the record as a sole supplier for the village’s preferred pump. Trustees voted to fund the purchase from the sewer capital improvement reserve; staff noted that reserve accounts are in place for such infrastructure needs and that moving funds between reserves does not require a permissive referendum in the circumstances discussed.

Board members urged public education to reduce non‑flushables entering the system; staff said they will follow up on funding transfers and on longer‑term capital planning for pump‑station upgrades.