Planning commission conditionally approves Highland Point sign, allows black on Macedonia Commons sign package
Summary
The Macedonia Planning Commission approved a ground-sign panel update at 8050 Highland Point Parkway contingent on a landscaping plan and granted administrative approval for a PowerUp Studio tenant sign in Macedonia Commons while formally accepting black as an allowable commons color.
Get email alerts on the Signage topic
No spam. Unsubscribe anytime.
The Macedonia Planning Commission on May 18 approved two tenant sign applications and recorded direction on sign colors for the Macedonia Commons common sign package.
Mr. France, the city planning staff member, told the commission his May 9 memo showed the applicant for 8050 Highland Point Parkway sought to "essentially revise with a new name the existing ground sign on the property." He recommended approval "subject to the landscaping issue just discussed," noting the existing dense landscaping near the sign appeared removed and no replacement landscaping had been submitted.
A commissioner moved to approve the Highland Point sign application "upon the submission of a landscaping plan to be approved administratively," and the motion passed.
On a separate application for PowerUp Studio (Unit 20, Macedonia Commons), staff reported the proposed two-line wall sign measured just under 30 square feet and met area and mounting requirements once minor dimensional clarifications were addressed. The planning packet included owner approval of the tenant's sign submission.
The primary point of contention was color. Staff explained the sign code's intent language (117901) limits signage to primary and complimentary colors; black is neither. The applicant said the logo-based sign appears black by day and white when illuminated. Commissioners debated whether "complimentary" could be interpreted to allow black or whether an explicit record accepting black on the common sign package was required.
A commissioner moved to approve PowerUp Studio subject to administrative review for conformance with staff's May 9 memo and to note that the commission accepts black as an allowable color for the Macedonia Commons sign package. The motion carried.
What happens next: Both approvals were documented in the meeting record. The Highland Point approval requires the applicant to submit a landscaping plan for administrative review before final sign installation; the PowerUp approval proceeds through administrative review for technical conformance with staff comments.
Key speakers: Mr. France (planning staff); an applicant representative; the commission chair and multiple commissioners.