Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Water System topic

No spam. Unsubscribe anytime.

Warwick reports Hilltop water-pressure loss after valve failure; system declared safe

Board of Trustees of the Village of Warwick · June 15, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Village staff said a pressure-reducing valve malfunction on June 15 drained the Hilltop tank; the tank was isolated and refilling by 10 a.m., and treatment safeguards kept the water system safe while pressure recovered.

Village officials reported that on June 15, 2026 a pressure-reducing valve malfunction caused a significant loss of water pressure in Warwick's Hilltop pressure zone. Barry, speaking for village operations, said the tank was isolated by 10:00 a.m. and has been steadily refilling since then.

"All water treatment and distribution facilities are now fully operational and water pressure in the Hilltop area continues to improve," Barry said, adding that village staff and the village's consultant, H2 H2O, were monitoring the system. "The water system remains safe as treatment safeguards function as designed during the incident," he said.

Officials apologized for inconvenience to residents and thanked the water department and the consultant for detecting and addressing the malfunction in a timely way. The board did not report any boil-water order or similar public-health restriction; staff said the system's treatment systems operated normally during the event.

The board authorized ongoing monitoring and noted that the public will be updated if further action is necessary. The meeting then continued with other agenda items.