Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation Safety topic

No spam. Unsubscribe anytime.

Board approves 24/7 flashing warning device at E. Newport Road trail crossing, discusses broader flashing-signal plan

Warwick Township Board of Supervisors · May 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Warwick Township approved a replacement 24/7 flashing warning device at the E. Newport Road trail crossing and discussed broader installation and maintenance of solar-powered flashing devices with PennDOT at SR 501 and Lexington Road.

The Warwick Township Board voted May 20 to install a 24/7 flashing warning device at the E. Newport Road trail crossing and discussed related trail-safety improvements.

Township Manager Brian Harris told the Board that pedestrian-activated flashing signals at some trail crossings are intermittent and parts are no longer available. He recommended replacing the pedestrian-activated devices with continuous 24/7 flashing signals to reduce motorist confusion when lights begin flashing; the township also plans double gates at crossings and is considering split-rail fencing to prevent bicyclists from going around gates.

Board members discussed the potential for motorist confusion and noted a learning curve for drivers who might interpret a flashing light as a mandatory stop. Harris said common-sense education for bicyclists—such as signage suggesting riders dismount and walk across the road—might reduce incidents; he noted three recent incidents at crossings were bicycle-related.

On a motion by Supervisor Kelly Gutshall, seconded by Supervisor Jeff Tennis, the Board voted unanimously to install a 24/7 flashing warning device at E. Newport Road. Harris also briefed the Board on a PennDOT application to place solar-powered flashing warning devices on SR 501 at Lexington Road; PennDOT would install the devices but the township would accept long-term maintenance responsibility, with bids and installation expected in late 2026 and early 2027, respectively.

The Board agreed that local outreach and a reporter’s article could help alert the public to the change in signal operation and safety expectations.