Commission approves bleacher pad and trail connection at Hagstrom-King Park

Mendota Heights Parks and Recreation Commission · March 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Parks and Recreation Commission voted unanimously to include a concrete bleacher pad and trail connection to Hagstrom-King Park as part of the Hampshire Estates Street Improvement Project; the pad and trail will be funded from the Special Parks Fund and bid with the street work, with bleachers purchased and installed separately.

Assistant City Engineer Lucas Ritchie presented the proposed bleacher pad and trail connection tied to the Hampshire Estates Street Improvement Project, saying the concrete pad and trail would be funded through the Special Parks Fund and bid as part of the street project; the physical bleachers would be purchased through a separate procurement and installed afterward.

Commissioners asked about impacts to Mendota Heights Road, possible alternate connection points and crosswalk placement. Ritchie explained why the proposed placement was chosen to provide better connectivity and described resident engagement that staff conducted with nearby neighbors. Chair Jaffrey Blanks said the placement represented the most cost-efficient option discussed to date.

Commissioner Michelle Muller asked that a trash receptacle be added and suggested two possible locations; Parks and Recreation/Assistant Public Works Director Meredith Lawrence said staff would review trash placement following project completion. After discussion, the commission approved inclusion of the bleacher pad and trail connection at Hagstrom-King Park (Motion Muller/second Ramirez, AYES 6: NAYS 0).

Funding for the concrete pad and trail connection will come from the Special Parks Fund, and the city will package the work for bidding as part of the street rehabilitation project. The commission did not vote on a specific bleacher vendor or the locations of trash receptacles; staff will return with placement details as the project advances.