Summary
An engineering report recommended tree removal and increased slope at the town’s salt shed (rough concrete estimate $18,000); the report also included a $78,000 culvert-only estimate for Glidden Bridge; board to schedule site visit for further review.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
The Jefferson Select Board on Aug. 25 reviewed engineering recommendations for the town’s salt shed and preliminary cost information for Glidden Bridge.
Pamela Grotton said the salt-shed report recommended cutting several trees near the structure and adding more slope away from the shed. Road Commissioner Wayne Parlin gave a rough concrete-cost estimate of about $18,000 to address slope and concrete work; he was asked to obtain firm bids and to consult Robert before work proceeds.
On Glidden Bridge, the engineering report included a culvert-only estimate of $78,000. Pamela Grotton said she will arrange a site visit with Eric, Wayne Parlin and Claudia Orff-Reed to assess options.
Separately, resident Dana Bond reported exterior lights at the Town Office are now aimed toward his house; the board asked staff to check with Darin Walker and the Fire Department for equipment to reach and redirect the fixture.
No formal capital-authorization votes were taken at the Aug. 25 meeting; the board instructed staff to gather estimates and return with recommendations.