Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Ramoda Minor Subdivision 98 topic
No spam. Unsubscribe anytime.
Commissioners approve Ramoda Minor Subdivision amid heated debate over 60-foot road easement
Summary
Park County Commissioners approved the Ramoda (Minor Subdivision No. 98) sketch plan for a 1.91-acre lot split, but commissioners split over whether to require a 60-foot easement for Pony Trail; the board accepted staff'recommended administrative relief on width while prohibiting further subdivision until Pony Trail meets county standards.
Get email alerts on the Ramoda Minor Subdivision 98 topic
No spam. Unsubscribe anytime.
The Park County Board of Commissioners voted to approve the sketch plan for Ramoda Minor Subdivision No. 98 after a lengthy public hearing and sustained debate over road easement requirements and water-quality findings.
Planning staff (Joy Hill and Kim Divin) summarized the application by Grant Cadwalder and Alexander Fu to create a 1.91-acre residential lot from a 47.31-acre parent parcel in the GRP zone. Staff said applicable agencies had been notified, Park County Fire District 1 can provide protection, Park County School District 1 will place a bus stop on Pony Trail, and multiple utility providers (Rocky Mountain Power, MDU, TCT) can serve the parcel. Public works and the county engineer identified that Pony Trail currently has a 20-foot traveled surface within a 30-foot access easement and recommended administrative relief from the county's 60-foot right-of-way and 24-foot surface requirement; public works also recommended a note on the final plat limiting further subdivision until Pony Trail meets county road standards.
Staff presented groundwater and water-quality data for the proposed lot. A groundwater test found high groundwater at about 7 feet, percolation tests showed rates that may require engineered septic systems, and a nearby well sample reported sodium and high total dissolved solids (TDS); staff recommended a plat note that a nearby Energy Labs water test "recommends treatment and annual monitoring."
Several commissioners and public commenters pressed for a firm 60-foot easement to preserve future ability to bring Pony Trail up to county road-and-bridge standards. Commissioner Thiel argued the county should insist on the full 60-foot easement because future subdivisions along Pony Trail would depend on that right-of-way, while other commissioners emphasized the hardship to the current owner (who said a 60-foot easement would come close to existing buildings and septic) and pointed out that previous, nearby minor subdivisions had been approved without the 60-foot standard. The applicant, Grant Cadwalder, said he does not wish to set aside the extra easement now and noted neighboring landowners would also be needed to create a contiguous 60-foot corridor.
The board ultimately approved the sketch plan with staff-recommended conditions, including (1) a note that lot one and the remainder parcel cannot be further subdivided until Pony Trail meets Park County road-and-bridge standards; (2) the applicant must provide required easements to utilities and public agencies; (3) final-plat requirements for a notarized road-maintenance disclosure and recorded maintenance agreement; (4) a plat note about potential high groundwater and engineered wastewater systems; and (5) a revised water-note referencing the Energy Labs report and recommending treatment and annual monitoring rather than listing analytes. Commissioner Thiel recorded a dissent, saying he would not support the motion because he wanted the 60-foot easement requirement to be mandated now rather than leave it to future action.
"I think we're picking and choosing who we're going to do and moving forward," Commissioner Thiel said, explaining his vote against the approval. Applicant Grant Cadwalder told the board he understood the road concerns but objected to setting aside the 60-foot corridor across his land now because it would place improvements very close to existing structures.
The board's action leaves the subdivision approved at the sketch-plan stage with specific plat notes and preconditions for final plat review. Staff will return with the final plat once the applicant satisfies the listed conditions.

