Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Parks Playground topic
No spam. Unsubscribe anytime.
Fairfield council approves playground Option 2 with rubber mulch surface for new park
Summary
After debating three playground designs and surfacing options, council approved Option 2 with a larger rubber-mulch surface; members also discussed flagpole placement, pickleball court capacity and irrigation needs for the park project.
Get email alerts on the Parks Playground topic
No spam. Unsubscribe anytime.
Council members reviewed three playground designs and debated surfacing choices — rubber mulch versus artificial turf — and the overall park footprint. Several members raised cost concerns (estimates cited in the packet ranged into the six figures for larger options) and heat/maintenance concerns with turf.
Speaker 5 moved to approve Option 2 with the larger rubber-mulch surface; Speaker 4 seconded the motion. After roll-call-style responses, the chair announced the motion passed.
Council discussion also covered related park elements: adding a flagpole (members discussed a historically accurate 90-foot pole versus a modern metal pole and the engineering costs such a historical design could incur), irrigation placement and whether the pickleball area allows expansion from two courts to four in the future. Staff will incorporate the council’s design preferences and return with bid-ready drawings.
What’s next: Staff to finalize the playground and park plan per council direction, get cost estimates for surfacing and installation, and include irrigation and flagpole details in the next submission for bidding.
