Planning board recommends four voluntary annexations on South Ocean Drive, citing sewer access and nonconforming lots

Fort Pierce City Planning Board · January 12, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board recommended approval of four voluntary annexations on Hutchinson/South Hutchinson Island (three residential, one commercial) after staff found statutory tests met and applicants described plans to extend sewer service with FPUA; votes were unanimous or passed by majority as recorded by roll call.

The Fort Pierce City Planning Board on Jan. 12 recommended that the city commission approve four voluntary annexation petitions on South Ocean Drive (Hutchinson Island area), concluding the applications met statutory eligibility tests for voluntary annexation and would improve or enable utility service connections.

Staff presented four separate petitions — PZ Annexation 2025‑0006 (Tony Acerra, ~0.19 acres), PZ Annexation 2025‑0008 (Alberti property), PZ Annexation 2025‑00009 (Fowler/Murray property, ~1.42 acres, mixed commercial/residential) and PZ Annexation 2025‑00007 (corner lot, ~0.21 acres). In each case staff said the parcels are adjacent to the municipal boundary, are reasonably compact, and would not create enclaves, and recommended future land‑use designations to match existing adjacent city zoning (R‑1 for residential lots; general commercial C‑3 for the mixed parcel where appropriate).

Staff told the board that several lots on the Barrier Island cannot construct septic systems because of wetland and hydric soils and indicated that connection to FPUA water and sewer — or the extension of sewer lines — is required for buildability. Chris Anderson (planning staff) summarized statutory tests for voluntary annexations and noted the technical review committee and departments supported the petitions given sewer plans and nonconforming lot treatment under the city land development code.

Applicant Tony Acerra told the board he had engaged Florida Fish and Wildlife and the Florida Department of Environmental Protection (DEP) and said he and other property owners are preparing private funding mechanisms with FPUA (an escrow arrangement) to extend sewer service. Acerra said his DEP work and mitigation have been completed and that his goal is to make the lots buildable under city rules. He said estimated per‑lot costs to participate in the sewer extension would be “about $5,000 to $6,000 a piece” and that he had arranged mitigation bank coordination and prior DEP approvals for at least one lot.

Board members asked detailed questions about contingency for additional lots, DEP approvals, right‑of‑way and road construction costs through mangrove areas, and whether annexation would increase development entitlements. For the larger Fowler/Murray parcel staff noted annexation would reduce the county entitlements (by roughly three residential units and ~15,500 sq ft of commercial floor area) if placed under the city’s land‑use and zoning standards; the board discussed height limits, overlay district rules, and conditional‑use review for any future development.

Motions: For each annexation the board voted to recommend approval to the city commission (motions made and seconded on the record for each item; roll‑call votes were taken and each motion passed). The board recorded votes on each item and the chair declared the motions passed.

What the board did not decide: No final adoption was made — each recommendation goes to the city commission, which will hold a transmittal hearing and accept or modify the board’s recommendation after state agency review if required.

Why it matters: Annexation will change jurisdictional control for permitting and zoning on the Barrier Island parcels and enable utility hookups that applicants say are necessary to make the lots buildable. Environmental permitting (mangrove and wetland mitigation) and the sequencing of sewer extension remain key implementation issues.