Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Compost Transfer Station topic

No spam. Unsubscribe anytime.

Selectmen approve small compost pilot and discuss recycling at transfer station

Stonington Board of Selectmen · June 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Selectmen approved a small composting pilot by Chickadee Compost at the transfer station and discussed restarting recycling; the board approved space for Kate Tompkins' tote-based system and asked for safeguards to limit gull‑attracting seafood waste.

The Stonington Selectmen approved a small pilot composting operation at the town transfer station and discussed how to resume a limited recycling program amid public‑health concerns.

Kate Tompkins presented a design for a compact compost operation using totes and solar fans; she told the board the system will include lids and expects 6–8 weeks for piles to cure. The Selectmen approved a space at the transfer station for the pilot, with conditions to avoid seafood waste that could attract gulls.

Separately, Town Manager Billings asked the board whether the town should resume recycling operations. Board members expressed support for recycling but raised staff‑safety concerns related to COVID‑19 surface contamination; TM proposed an outdoor collection arrangement that would let materials sit to reduce viral risk before handling. The board asked TM to price a simple outdoor shed/tote solution; the minutes show an estimate under $1,000 for materials and labor.

Why this matters: Local composting can reduce landfill shipping volumes, support local agriculture and divert organics. Restarting recycling helps sustainability but must be balanced with worker safety during a public‑health emergency.

What’s next: The transfer station compost pilot will proceed with the agreed conditions; TM will develop a plan and cost estimate to restart a limited recycling collection area for board review.