Dead River to replace heating-oil tank in Stetson; town must prepare gravel pad

Town of Stetson Selectmen · January 8, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Selectman Millard Butler reported that Dead River will remove an existing tank and install a new 1,000-gallon tank at a town site; the town is responsible for installing the gravel pad and the adjacent wall may need removal.

Selectman Millard Butler reported at the Jan. 8 meeting that he spoke with Jim at Dead River and that Dead River will remove the current tank and install a new 1,000-gallon tank. Butler said the wall near the tank may have to be removed to accommodate the replacement and that the Town of Stetson will be responsible for installing the gravel pad for the new tank.

No additional technical or scheduling details were provided at the meeting; selectmen did not record any vote on the installation during the public session. The board directed staff to coordinate with Dead River and to arrange for the gravel pad and any required site work prior to installation.