Silver Spring Authority records final payment, lists $11.5 million in North I‑81 sewer contract costs

Silver Spring Township Authority · October 16, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Authority approved the final contract payment on the North I‑81 sewer extension and authorized related transfers; minutes list $11,531,309 in contract payments and $1,564,597.38 for road rebuilding costs tied to the project.

The Silver Spring Township Authority on Oct. 16 approved the final contractor payment tied to the North I‑81 sewer extension and authorized a transfer from sewer revenue to cover October capital costs.

Authority minutes recorded that the project’s contract payments totaled $11,531,309.00 and included $1,564,597.38 in costs for rebuilding impacted project roads with 6 inches of stone base and 4 inches of asphalt binder (25mm) for the full width of those roads. The board also approved Payment #19 to PACT ONE LLC for $546,276.71, which the minutes say concludes payments on that contract.

Why it matters: The North I‑81 sewer extension was completed in August 2024 and the closeout payments and associated paving work represent the bulk of the Authority’s capital outlays for the month. The board moved to fund those outlays by transferring money from operating receipts into the capital reserve.

The board authorized a $540,000 transfer from the Sewer Revenue account to the Capital Reserve Account on a motion recorded as made by Chairman David Weihbrecht and seconded by David Lenker II. The minutes record the transfer was to cover capital project expenses for October, including the final North I‑81 payment.

Engineer William Rudy briefed the board on related coordination work: he said authority staff will meet with Mechanicsburg Borough staff to discuss the Church Road paving project and to coordinate installation of a low‑pressure sewer system serving 14 homes on that street.

Procedural record: The PACT ONE LLC payment (Payment #19, Contract 2022-01G / 2022-01PS) was approved on a Secary-Lenker motion; the minutes state the motion carried. The minutes note the North I‑81 project work began in August 2022 and was completed in August 2024.

What’s next: The minutes and attached memo list remaining administrative and engineering charges related to project closeout; the board recorded the final contract outlays and concluded the contractor payment set.