Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Airport Project topic

No spam. Unsubscribe anytime.

Montezuma materials show $134,700 work authorization with Holt Consulting for 10‑unit T‑hangar design

City of Montezuma Mayor & Council · January 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Resolution #737 and Work Authorization No. 10 with Holt Consulting Company appear to authorize design‑phase services for a 10‑unit T‑hangar at Dr. C.P. Savage Sr. Airport with a not‑to‑exceed fee of $134,700 and an estimated 120‑day design schedule.

Documents in the record include Resolution #737 and Work Authorization No. 10 proposing Holt Consulting Company, LLC provide design‑phase services for a 10‑unit T‑hangar at Dr. C.P. Savage Sr. Airport. The work authorization lists a not‑to‑exceed fee of $134,700 covering six elements: project formulation, survey work, geotechnical investigation, construction plans, contract documents and coordination/review.

The scope calls for FAA and Georgia Department of Transportation coordination (including FAA Form 7460 filings and CSPP), topographic survey allowances, geotechnical investigation, detailed construction plan sheets, and contract documents aligned to FAA, GDOT and AIA specifications. The materials estimate the design phase will take about 120 calendar days from execution, and note exclusions including bidding‑phase services and certain utility design tasks.

Attachment summaries break down labor, overhead and direct expenses that compose the $134,700 figure and list projected staffing hours and expense allowances (mileage, lodging, printing). The record shows the resolution and work authorization text but does not include a signed execution page in the provided excerpts.