Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

Miltona Township approves road repairs, chloride purchase and orders culvert compliance

Miltona Township Board · March 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board accepted a chloride quote at $1.35 per gallon for 2025, approved Bargen crack‑repair and clear‑seal work on Smokey Timber(s) Road, approved a second quote for Hidden Valley Road contingent on Leaf Valley Township's sign‑off, and directed a letter to a landowner to install the required culvert.

Miltona Township's board approved several road‑maintenance actions at its March 10 meeting, authorizing contractor work and buying road‑treatment product for the 2025 season.

Jerome Haggenmiller moved and Matt Kugler seconded acceptance of a chloride quote at $1.35 per gallon for 2025; the board approved the purchase by a 3‑0 vote. The board also approved Bargen's quote to perform crack repairs and reapply a clear seal on Smokey Timber(s) Road (motion by Matt Kugler, seconded by Jerome Haggenmiller; motion carried 3‑0). A second, similar quote for Hidden Valley Road received conditional approval from the board, contingent on approval by neighboring Leaf Valley Township.

The board discussed drainage and culvert requirements on Smokey Timber(s) Road. Tom Blank said Land and Resource was contacted for drainage plans and reported that 18‑inch culverts are required at driveway crossings; the minutes note one driveway east of a water‑quality riser currently lacks the required culvert and that the board will send a letter requesting installation.

Widseth (the engineering firm) will perform further review and provide feasibility or engineering recommendations at the April 14 meeting, the minutes state.