Board approves septic-elimination cost study and tables sump-pump disconnection program
Summary
The board approved a task order to evaluate septic-system elimination costs and program options, and it tabled a separate discussion on a voluntary/mandatory sump pump disconnection program pending further staff and consultant work.
Get email alerts on the Inflow Infiltration topic
No spam. Unsubscribe anytime.
The board approved a task order to evaluate costs and program design for septic-system elimination to expand sanitary service options, then discussed but ultimately tabled a separate proposed sump-pump connection program intended to reduce inflow and infiltration (I&I).
For the septic-elimination item, staff described the task order scope: develop a baseline cost estimate, assess different connection scenarios, and propose reimbursement or subsidy options for homeowners. The packet showed a maximum amount transcribed in meeting minutes; the board approved the task order to proceed with the cost evaluation.
On sump-pump disconnection and I&I reduction, a consultant presented options including smoke testing, targeted house-to-house inspections, and program design for voluntary disconnection with public education or a combination of incentives and permit/license enforcement. Board members emphasized the challenge of locating perimeter drains and the need for a tailored approach. Several members said past voluntary programs worked in some neighborhoods but cautioned that incentives and enforcement mechanics must be thought through.
Given outstanding questions on scope, methods for detection and homeowner impacts, the board voted to table further action on the sump-pump program and asked staff and consultant to meet with stakeholders, refine methods for locating connected drains, and return with a draft policy and cost estimate.