Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Municipal Equipment And Contracts topic

No spam. Unsubscribe anytime.

Covington council approves AED, metal detector purchases and hires River Group for utility garage design

Covington City Council · February 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

At its Feb. 3 meeting, the Covington City Council approved purchases including a Fisher M-66 metal detector ($595) and an AED ($2,243), and voted to hire River Group to design a new street/electrical (utility) garage for a fee not to exceed $10,000.

Covington City Council on Feb. 3 approved several equipment purchases and contracted a design firm for a new utility garage.

Superintendent KC Smith asked the council for permission to buy a Fisher M-66 metal detector to locate water meters and valve boxes. Councilmember Randles moved to purchase the unit from Utility Supply Co. for $595.00; Councilmember Smith seconded and the motion carried 4-0, with Councilmember Copenhaver noted as arriving late and missing the earlier votes.

Police Chief Foster presented a quote for an AED from Stauffer Glove and Safety priced at $2,243.00. Councilmember Smith moved to purchase the AED Plus fully automatic defibrillator; Councilmember Martin seconded and the motion passed 4-0.

Mayor Crain asked the council to accept River Group to design the city’s new street and electrical (utility) garage, saying the fee would not exceed $10,000 and would include required state permits. Councilmember Smith moved to retain River Group and Councilmember Martin seconded; the motion carried 5-0.

The council also publicly thanked Supt. KC Smith and his department for fixing a recent leak that had prompted a temporary city water shutdown and thanked Supt. Myers for operating wells during that event.

Next steps: The River Group design will be used to prepare bids for construction of the new garage; meeting minutes do not specify a project timeline or target bid date.