District approves operational upgrades: force-main flushing, lift-station sampler and awning repair

Hoover Sanitary Stormwater District · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a force-main flushing upgrade ($13,680), a booster-pump/sampler replacement (approx. $3,781, contingent on warranty) and authorized awning repairs at the main lift station not to exceed $1,979.

The Hoover Sanitary Stormwater District approved several operations and maintenance items intended to improve sampling, force-main performance and lift-station infrastructure.

Operations staff requested purchase of a new sampler for the main lift station for $3,781 and asked the board to make the purchase contingent on demonstration of a warranty period. The board approved the purchase contingent on confirming a warranty.

Staff also presented a Poshgen Electric proposal to upgrade the force-main flushing program with a hardware/software interface to schedule automated flushes of a 30-inch force main. Staff described it as a one-time fee that provides an adjustable HMI screen and agreed procedure; the board approved the program modification and the stated cost of $13,680.

Finally, operations staff reported storm damage to an awning at the main lift station and presented two repair options; the board authorized repair or replacement not to exceed $1,979 depending on frame condition. Staff noted the awning had been recovered from a river and the frame would be inspected before deciding the repair path.

Each approval was taken by voice vote; staff will confirm warranty terms for the sampler, implement the flushing upgrade and schedule the awning work as appropriate.