Bolton Land Trust's tree-and-scrub removal at 40 Brandy Street approved with erosion controls
Summary
The Bolton Inland Wetlands Commission unanimously approved a jurisdictional ruling allowing limited tree and scrub removal at 40 Brandy Street, requiring no chips be left in wetlands, sediment controls and use of low-pressure machinery; the permit was updated after the applicant corrected the cut-area measurement.
Get email alerts on the Land Trust Tree Removal topic
No spam. Unsubscribe anytime.
The Bolton Inland Wetlands Commission unanimously approved a jurisdictional ruling June 23 allowing limited tree and scrub removal at 40 Brandy Street proposed in the Bolton Land Trust's application.
Gwen Marriott discussed the application and corrected an error in the stated size of the cut area; Wetlands Agent Alyssa Barroso confirmed the permit was updated to reflect the corrected measurements. Barroso said the permit now includes the measurement change and reiterated the commission's enforcement expectations for work near wetlands.
Member James Loersch asked about the type of equipment that would be used. Marriott and commissioners said low-pressure machinery would be used and emphasized that soil should not be disturbed and that sediment controls must be in place. The commission approved the project as a jurisdictional ruling as-of-right with these conditions: chips must not be left in wetlands, sediment-control measures must be completed before and during work, and appropriate low-pressure equipment must be used. James Loersch moved the approval and Diane DeNunzio seconded; the motion carried unanimously, 3–0–0.
The commission's action formalizes the Bolton Land Trust's ability to complete the conservation-oriented vegetation work under the stated conditions. Agent Barroso noted the tree-cutting deadline for this site had passed, which affected the timeline for the permitted work.
The commission did not record any public comment on the item. The next procedural step is for the applicant to meet the permit conditions and for staff to inspect compliance.