Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Development Approvals topic

No spam. Unsubscribe anytime.

Board approves conditional use and preliminary/final land development with waivers for Carlisle Pike site

Silver Spring Township Board of Supervisors · May 28, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Board approved a conditional use for Parcel 38‑23‑0569‑019 and granted preliminary/final land development approval with waivers for a 17,800‑square‑foot building at 7044‑7048 Carlisle Pike, including landscaping and sidewalk deferrals; approvals included specified waivers and a sidewalk deferral agreement.

The Board approved multiple land‑use items at the May 28 meeting. Joe Burget, Jr. (Burget & Associates) presented the final site layout for a conditional use application for Parcel 38‑23‑0569‑019; on a Griffie/Kotzmoyer motion the Board approved the Conditional Use as presented.

Separately, the applicant for 7044‑7048 Carlisle Pike requested preliminary/final land development approval to construct a 17,800 square foot building and sought relief from interior landscaping, curbing surrounding parking, and other standards. The applicant offered additional landscaped areas in lieu of required interior landscaping for end islands and requested sidewalk deferral on Carlisle Pike and Ridge Hill Road. The Board approved the preliminary/final land development plan with the proposed waivers and a sidewalk deferral agreement, on a Lenker/Kotzmoyer motion; the motion carried.

Why it matters: The approvals allow the proposed building and site configuration to proceed subject to the waivers and conditions; the sidewalk deferral will be memorialized in an agreement and engineering comments must be addressed as required.