Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facility Maintenance topic

No spam. Unsubscribe anytime.

Polk County board approves replacement of leaking courthouse boiler; estimate $150,000'$220,000

Polk County Board of County Commissioners · December 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Polk County Board of County Commissioners voted Dec. 16 to accept a proposal to add a new cast-iron sectional boiler and isolate a leaking 100-year-old courthouse boiler; the estimate for the new boiler and installation is $150,000 to $220,000.

Polk County commissioners voted Dec. 16 to accept a quote from Rasmussen Mechanical Services to add a new cast-iron sectional boiler and isolate a corroded, leaking original courthouse boiler. Commissioner Boss moved to accept the replacement quote; Chairman Jerry Westring seconded the motion, and the roll-call vote was Boss, aye; Westring, aye; Boruch, aye.

The board considered two proposals from Rasmussen Mechanical Services: a lower-cost repair option to attempt to repair a corroded return line inside the existing boiler, and a higher-cost replacement option to install a new sectional boiler and isolate the leaking unit. The minutes state the repair quote was significantly lower but noted there was no guarantee the roughly 100-year-old boiler could be successfully repaired; the board therefore approved the replacement option. The estimated cost range for the new boiler and installation is $150,000 to $220,000 as recorded in the minutes.

Rasmussen Mechanical Services provided the quotes; the minutes do not specify a final contract amount or payment schedule. The board recorded the vote approving the replacement, and county staff are expected to coordinate procurement and installation steps consistent with county purchasing rules.